Estado:
Complete
Location:
Kota Cimahi - Indonesia
Region:
Asia
Total cost:
USD $50,300
Duration:
2 years
Start:
12 November 2010
End:
23 November 2012
Working Areas
Asset Management
Billing & Collection Efficiency
Service in Low-Income Areas
Organizations Involved
Perusahaan Daerah Air Minum (Regional Water Utility Company) Tirta Raharja — Lead Mentee
Empresa Metropolitana de Abastecimiento y Saneamiento de Aguas de Sevilla — Lead Mentor
Asian Development Bank (ADB)
Funder
SDGs
6.1Universal and equitable access to safe and affordable drinking water for all
Project description
One of the aims of this WOP is to share in knoledge in Non Revenue Water (NRW) management
Project main objectives
I Improve the PDAM leak control policy through

II. Evaluate the ageing of the installed meters and its impact on NRW
Most significant results
As a result of the work carried out under the WOP, the NRW in the working area has decreased from 38% to 22% after the detection of 5 leaks by means of acoustic devices and their subsequent repair.
This has meant 16% saving of supplied water.
The have realised that the pipes of the other area under control was very old and have to be renew.
The replacement of class B meters by class C meters has led to increase the invoicing of the local water utility (PDMA) by 10.65%.
The reason of such increase is that small water flow rates really consumed by the clients are now being measured whilst the old meters couldn't register them.
Challenges
Inadequate understanding of capacity needsLack of commitment by one or both utilitiesLack of financing for WOPsLack of follow up financingLack of management commitmentPoor partner selectionPractice transfer inappropriate